← Back to BOH

Back of House

Opening Kitchen

Today's Mission

Prepare the building so every prep team can begin executing its prep list without interruption.

Production Readiness

0 of 7 missions complete

0%

Mission 1

Prepare the Building

Mission 2

Sanitation Ready

Mission 3

Review Closing Standards

Mission 4

Verify the Production Plan

Mission 5

Confirm the Prep Team

Mission 6

Verify Line Equipment

Mission 7

Begin Production

7 missions remaining.

Mission 1 — Prepare the Building

Make the building usable before production begins.

0 / 5

Mission 2 — Sanitation Ready

Prepare a clean, sanitary environment for food production.

0 / 5

Mission 3 — Review Closing Standards

Were closing standards upheld?

Mission 4 — Verify the Production Plan

Confirm that today's prep team has the correct production plan.

Prep sheets printed?

Prep sheets validated?

Managers verify the sheet. They do not alter pars.

Any abnormally low prep quantities?

Capture observations so recurring patterns can be reviewed later.

Mission 5 — Confirm the Prep Team

Is the scheduled prep team present and able to begin?

Mission 6 — Verify Line Equipment

Confirm every line cooler and freezer is ready before the shift needs it.

Expo Cooler

Standard: 41°F or below

°F

Fry Cooler

Standard: 41°F or below

°F

Fry Freezer

Standard: 0°F or below

°F

Point Cooler

Standard: 41°F or below

°F

Grill Cooler

Standard: 41°F or below

°F

Grill Drawer Cooler

Standard: 41°F or below

°F

Salad Cooler

Standard: 41°F or below

°F

Sauté Low Boy Cooler

Standard: 41°F or below

°F

Mission 7 — Begin Production

Have the prep teams started executing their prep lists?